Contact

    Chengdu Huibao Energy Technology Co. Ltd.
  • Contact :Mr. Li
  • Tel:028-82213905
  • Mobile:13980030203,18382141999
  • Fax:028-82213905
  • Email:lizh6688@163.com
  • Website:www.cdhbjn.com
  • Address:Sichuan city of Chengdu province Innovation Road Economic Development Zone Chongzhou Lixing home C49 No.

Chengdu polyurethane composite insulation board

productname:

Chengdu polyurethane composite insulation board

productcodee:
Product introduction:

tag:

Polyurethane composite insulation board, Chengdu polyurethane composite insulation board price, Chengdu polyurethane composite insulation board wholesale,

begintime:

2018/4/12 19:32:18

Source:

http://www.cdhbjn.com/foreign/en/supply/1.html

Chengdu polyurethane composite insulation board using special tool sticking board gently, uniform extruded polyurethane board, adhesive mortar and wall contact closely, and with the adjacent polyurethane board flush bonding mortar extrusion with the shovel scraping, the bond is dense, adhesive polyurethane board, at any time with 2M on foot and check flatness and supporting board the vertical glue plate carefully when clearing mortar board edge overflow, so that no "met ash" between the board and the board, seam spell strict, joint plate packing corresponding thickness more than 2MM wide application, two adjacent plate seam height not more than 1.5MM, otherwise the application of wire brush polishing. Not to touch within 24 hours of polyurethane board paste, if there is no loose polyurethane board pasted firmly, should be removed to wipe bonding mortar and paste. Chengdu polyurethane composite thermal insulation board, polyurethane board paste after 24 hours, according to the design requirements by mechanical anchor fixing polyurethane board, polyurethane board with percussion drill in inward surface drilling, depending on a fixed aperture diameter, wall depth shall not be less than the design requirements, in or out in the anchoring nail, the nail head and the disc shall be beyond the surface of polyurethane, anchors and the number of models is determined in accordance with design requirements. Prepared by the factory finished mortar powder Chengdu polyurethane composite thermal insulation board crack resistance of polymer mortar, in accordance with the powder: water =1:0.23 (weight ratio) mixture preparation cracking mortar, strict measurement, mechanical stirring, stirring time of not less than 8 minutes, to ensure uniform mixing, the mortar mix also need to use the two time mixing in the static stop after ten minutes, two times the mixing time of not less than 5 minutes, the mortar with a good sunscreen should pay attention to the shelter, a preparation of the amount should be controlled in the operation run out of time, generally should not exceed 2 hours, more than operation time after the quasi water (GUM) use again.

028-82213905
hotlines for national customer service

Address:Sichuan city of Chengdu province Innovation Road Economic Development Zone Chongzhou Lixing home C49 No.